Hispanic Business TVHispanic Business TV
  • Featured
  • Popular Cities
    • Atlanta
    • Boston
    • Chicago
    • Dallas
    • Denver
    • Houston
    • Las Vegas
    • Los Angeles
    • Miami
    • New York
    • Phoenix
    • Salt Lake City
    • San Antonio
  • Business
    • HBTV Toolbox
      • Social Media Management
  • Politics
  • HBTV Sports
    • MLB
    • MMA
    • NCAAF
    • NBA
    • NCAAM
    • NFL
    • NHL
  • Entertainment
  • Living
    • Culture
    • Latino Lifestyle
    • Education
    • Cannabis
Reading: Phoenix Celebrates Opening of South Central Extension/Downtown Hub Light Rail Project
Share
Sign In
Notification Show More
Font ResizerAa
Font ResizerAa
Hispanic Business TVHispanic Business TV
Search
  • Featured
  • Popular Cities
    • Atlanta
    • Boston
    • Chicago
    • Dallas
    • Denver
    • Houston
    • Las Vegas
    • Los Angeles
    • Miami
    • New York
    • Phoenix
    • Salt Lake City
    • San Antonio
  • Business
    • HBTV Toolbox
  • Politics
  • HBTV Sports
    • MLB
    • MMA
    • NCAAF
    • NBA
    • NCAAM
    • NFL
    • NHL
  • Entertainment
  • Living
    • Culture
    • Latino Lifestyle
    • Education
    • Cannabis
Have an existing account? Sign In
Follow US
© 2024 hispanicbusinesstv All Rights Reserved.
Hispanic Business TV > Phoenix > Phoenix Celebrates Opening of South Central Extension/Downtown Hub Light Rail Project
Phoenix

Phoenix Celebrates Opening of South Central Extension/Downtown Hub Light Rail Project

HBTV
Last updated: June 9, 2025 11:56 pm
HBTV
Share
8 Min Read
SHARE


On Saturday, June 7, more than 5,000 community members, along with federal, state and local officials, gathered to celebrate the opening of the South Central Extension/Downtown Hub (SCE/DH) light rail expansion in Phoenix. The extension represents an historic milestone for Valley Metro Rail marking the system’s evolution to a 35-mile two-line rail system. The A line now travels east/west and the B line travels north/south with weekday service increased to 12 minutes before 7 p.m.

“The completion of this project marks an important new connection for residents and moves us closer to our goals as a sustainable and accessible city,” said Mayor Kate Gallego. “This historic extension introduces the region’s first two-line rail system, creates safer streets and new bike lanes, and adds shade and public art– all while connecting more residents to jobs, education, entertainment and other amenities across the Valley. Equally important, it provides a whole new opportunity to showcase the unique offerings of this thriving corridor.”

The $1.34 billion project was made possible through strong federal-local partnership, with federal grants providing more than half the funding alongside Phoenix Transportation 2050 and regional Proposition 400 investments.

“Arizonans understand that these infrastructure investments make us more connected and more prosperous,” said U.S. Congressman Greg Stanton. “As we now look westward for future light rail expansion and anticipate the extensions of the streetcar line in the East Valley, we’re in a magical moment in Phoenix’s history, and we can only keep up this momentum if we keep investing in ourselves.”

The extension will add more than 8,000 daily riders to the light rail system, which currently serves an average of 32,000 boardings per day.

“I am excited for the opening of the South Central Extension! The residents of South Phoenix and District 7 have waited a long time for light rail and I am excited for how this new extension will connect South Phoenix with the rest of the city,” said Phoenix District 7 Councilwoman Anna Hernandez. “A robust public transportation and light rail are the future for our city and I am excited for how South Phoenix residents will benefit.”

Community-driven public art is prominently featured throughout the extension, with 18 installations created by artists, who are predominantly local, reflecting the character and cultural richness of south Phoenix neighborhoods.

“This grand opening marks a transformative moment for South Phoenix. The South Central Extension represents direct access to local businesses and a community that has historically been disconnected and overlooked,” said Phoenix District 8 Councilwoman Kesha Hodge Washington. “South Phoenix deserves investment, inclusion and infrastructure that lifts everyone around it, and that is the vision of the light rail extension.”

Today’s celebration was held at three locations – the Baseline/Central Ave Park-and-Ride, Ed Pastor Transit Center and Downtown Hub – included a “Cruisin’ Central” community procession with over 250 community participants, a lowrider and classic car show, family-friendly activities, performances by local entertainers and over 60 local business pop-ups and food vendors. The festivities culminated with a ribbon cutting ceremony and first rides at the Baseline/Central Ave Park-and-Ride.

“Today we are celebrating 5.5 new rail miles and the transformation of Valley Metro Rail into a multi-line operation, creating an important new connection to South Phoenix said Valley Metro CEO Jessica Mefford-Miller. “We built this project with the community to achieve their vision, and we will continue to we advance the community’s vision to connect to the West and East Valleys, and bring greater mobility and economic opportunity to more of metro Phoenix. I congratulate and thank the community and our teams for today’s successful opening!”

The project also created over 5,000 local jobs, with over 600 workers hired directly from south Phoenix communities. There are eight new stations, a new park-and-ride facility at Baseline Road/Central Avenue and a transit hub converging in downtown Phoenix. The extension also includes a number of community upgrades such as enhanced bike lanes, pedestrian pathways, over 550 new trees and desert-adapted landscaping along with comprehensive utility upgrades replacing more than 30 miles of underground infrastructure.

Valley Metro and City of Phoenix prioritized supporting small, locally owned businesses throughout construction through a first-of-its-kind grant program. Through the Small Business Financial Assistance Program, over 270 grants, totaling over $1.6 million, were awarded to small business along the corridor.

Review additional event photos. 

About Transportation 2050: In August 2015, Phoenix voters approved Transportation 2050 (T2050), a 35-year citywide transportation plan. T2050 is overseen by the Citizens Transportation Commission and includes improved frequency on local bus service, new light rail service and stations and major street improvement projects. Funding for T2050 comes from a 7/10ths of a cent city sales tax that started Jan. 1, 2016. Over the life of the plan, the funds are estimated to generate about $16.7 billion, or more than half of the plan’s overall cost. There will be an additional $14.8 billion in federal and county funds, passenger fares and other sources. For more information, visit the T2050 page or follow Phoenix Public Transit, Phoenix Street Transportation and Valley Metro​​ on X.​ 

About Valley Metro: Located in the fastest-growing county in the U.S., Valley Metro connects people to their most important destinations each day. Riders travel across the metro-Phoenix area on eco-friendly public transit including bus, light rail, paratransit and streetcar. Progress continues on additional high-capacity transit extensions that are either in planning or under construction to create a 50-mile rail system. Valley Metro also offers alternative transportation programs including paratransit services for seniors and people with disabilities, commuter vanpools, online carpool matching, bus trip mapping, bicycle safety and telework assistance. Two Boards of Directors from 19 local cities and towns and the county set the policy direction for the agency with the intent of advancing the regional public transit system in Maricopa County. In addition to federal and local funds, Valley Metro receives critical capital, bus and paratransit operations funds from Prop. 400, the 20-year, regional half-cent transportation sales tax. Voters continued the 20-year regional funding support for transit with the passage of Prop. 479 in 2024. Stay up-to-date by following us on  Facebook , Instagram, YouTube and X or by visiting valleymetro.org and downloading the Valley Metro app.





Source link

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.

By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Copy Link Print
Share
Previous Article Houston retires from Westfield Police Department
Next Article LA protest live stream: 700 Marines deployed to Los Angeles amid ICE protests
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

FacebookLike
XFollow
InstagramFollow
- Advertisement -
Ad imageAd image

Latest News

New closed primary leads to confusion in U.S. Senate race
Politics
May 17, 2026
Reyna Barske Calls on Class of 2026 to Remember their Inner Phoenix – Inside UW-Green Bay News
Phoenix
May 17, 2026
Aaron Rodgers returning to Steelers for 22nd NFL season in 2026 – NBC Los Angeles
NFL
May 17, 2026
Zoo Atlanta bomb threat that caused evacuation was false call, APD says – WSB-TV Channel 2
Atlanta
May 17, 2026

Advertise

  • Advertise With Us
  • Terms and Conditions
  • Privacy Policy
  • About Us
  • Contact

HispanicBusinessTV is your go-to source for the latest in Latino lifestyle, culture, and business news. Stay informed and inspired with our comprehensive coverage and in-depth stories.

Quick links

  • Advertise With Us
  • Terms and Conditions
  • Privacy Policy
  • About Us
  • Contact

Top Categories

  • Business
  • HBTV Sports
  • Entertainment
  • Culture

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

© 2025 HispanicBusinessTV.com All Rights Reserved. A WooWho Network Digital Property.
Join Us!
Subscribe to our newsletter and never miss our latest news, podcasts etc..

Zero spam, Unsubscribe at any time.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?